Thessaloniki Underground Railway
GREECE THESSALONIKI

Thessaloniki Underground Railway

  • CATEGORYInfrastructure
  • DEVELOPED YEAR2018
  • DEVELOPED BYAKTOR SA

The project includes the construction of 9,5 kilometers of line with two independent single-track tunnels, 13 modern platform stations and should be completed by 2020. There will be 18 driver-less trains and the stations will be equipped with platform screen doors

PROJECT PRODUCTS
GEODRAIN double structured wall perforated pliable conduits
GEOSUB double structured wall pliable conduit